AVA02

Amazon Logistics Centre Horn-Bad Meinberg

Automation of HVAC System Engineering, Supply and Installation

Project Details

Year of Execution: 2023-2024

Facility: Amazon Logistics Centre Horn-Bad Meinberg

Location: Horn-Bad Meinberg, Germany

Contract Price Level: $2M+

Key Project Stakeholders:

  • End User: AMAZON
  • Customer: BREMER AG
  • BMS Integrator: HONEYWELL

Scope of Supply:

  1. E&A: Automation of HVAC System
  2. Services: Engineering, Supply and Installation

Project Description:

The Amazon PAD2 logistics center, located in Horn-Bad Meinberg, Germany near Paderborn Airport, is a modern, high-tech facility that was built in approximately two years.

At the core of its logistics operations are the Robotics Floors. On these floors, products are stored using a dynamic (or “chaotic”) storage system, meaning that items do not have fixed storage locations. Instead, the system determines the optimal storage position for each item and records its location digitally.

For the automation of the HVAC systems, a solution from Honeywell was selected

My Role:

Project Manager responsible for project scope, schedule, and financial performance

Project Team:

  • 2 E&A Hardware Design Engineers (wiring diagrams, hook-ups, data sheets, cable lists, etc.)
  • Site Manager
  • Functional Manager (Procurement & Logistics)

Subcontractors:

  • DDC Panels — Compact Electric GmbH;
  • Installation Team (up to 20 people at peak);

Technical Description:

Amazon Logistics Centre Project includes:

Electrical & Automation package:

  • DDC Panels
  • Smoke Extraction Automation System
  • HMI System
  • Field Instrumentation

Automation Technical Solution / System Architecture:

  • Central Equipment: Honeywell CPO-Rxx, CPNx, JACE 8000
  • HMI: Honeywell EBI R700 (Enterprise Buildings Integrator)
  • Smoke Extraction Automation System: D&S Steuerungssysteme WD100
  • COMMUNICATION: RS485/BACnet, Ethernet