AVA02
Amazon Logistics Centre Horn-Bad Meinberg
Automation of HVAC System Engineering, Supply and Installation
Project Details
Year of Execution: 2023-2024
Facility: Amazon Logistics Centre Horn-Bad Meinberg
Location: Horn-Bad Meinberg, Germany
Contract Price Level: $2M+
Key Project Stakeholders:
- End User: AMAZON
- Customer: BREMER AG
- BMS Integrator: HONEYWELL
Scope of Supply:
- E&A: Automation of HVAC System
- Services: Engineering, Supply and Installation
Project Description:
The Amazon PAD2 logistics center, located in Horn-Bad Meinberg, Germany near Paderborn Airport, is a modern, high-tech facility that was built in approximately two years.
At the core of its logistics operations are the Robotics Floors. On these floors, products are stored using a dynamic (or “chaotic”) storage system, meaning that items do not have fixed storage locations. Instead, the system determines the optimal storage position for each item and records its location digitally.
For the automation of the HVAC systems, a solution from Honeywell was selected
My Role:
Project Manager responsible for project scope, schedule, and financial performance
Project Team:
- 2 E&A Hardware Design Engineers (wiring diagrams, hook-ups, data sheets, cable lists, etc.)
- Site Manager
- Functional Manager (Procurement & Logistics)
Subcontractors:
- DDC Panels — Compact Electric GmbH;
- Installation Team (up to 20 people at peak);
Technical Description:
Amazon Logistics Centre Project includes:
Electrical & Automation package:
- DDC Panels
- Smoke Extraction Automation System
- HMI System
- Field Instrumentation
Automation Technical Solution / System Architecture:
- Central Equipment: Honeywell CPO-Rxx, CPNx, JACE 8000
- HMI: Honeywell EBI R700 (Enterprise Buildings Integrator)
- Smoke Extraction Automation System: D&S Steuerungssysteme WD100
- COMMUNICATION: RS485/BACnet, Ethernet